Greatbatch, Inc.
Power Source Expansion

Project

M/E Engineering, P.C. was the Prime Consultant for this state-of-the-art manufacturing facility for implantable medical devices, including power sources (lithium batteries) and capacitors.

M/E Role

  • Battery manufacturing included a 13,800 SF, Class 100,000 Clean Room maintained at a -30°C dewpoint (<1/2% RH) with an FM200 Clean Agent Fire Suppression System.
  • Variable Volume Fume Hood Exhaust System.
  • Gas Engine Driven and Electric Screw Chilled Water Plant.
  • Gas Engine Heat Recovery.
  • Modular Pulse Boiler Plant Expansion.
  • Upgrade of Electrical Service and Emergency Power.

Challenges

Additions and renovations were developed in three phases to facilitate fast track construction in order to satisfy the Owner's schedule.

Location:
Alden, NY