Seneca Allegany - Casino and Hotel

Project

This casino facility was developed in phases with 1955 slot machines in the initial gaming area and 24 gambling tables being designed and built in less than six months.  The second phase included the construction of a 220 room hotel, high-end spa, pool, three restaurants and associated kitchen, 1850 car parking garage, retail stores, and back of house support spaces.  The final phase renovated the initial phase into a 2000 person event center suitable for televising in high definition, meeting rooms, buffet and kitchen.

M/E Role

M/E Engineering completed the design and construction administration for the HVAC, power, specialty lighting, IT, fire protection and plumbing systems for these additions.

Challenges

A fast track design and construction schedule required a coordinated effort with the Design Team, Construction Manager, Contractors and the Seneca Nation.

Location:
Salamanca, NY