Schuyler Ridge Skilled Nursing Home
40 Bed Addition/Occupancy Conversion
MEP Design
Clifton Park, NY
Project Highlights
New Construction consists of new, two story 40 single bed unit wing, and renovation of 40 existing double bed units to singles, along with support program and infrastructure.
HVAC design to include heat pump replacements in existing building, along with a cooling tower replacement and new kitchen make up air unit. Addition systems include ventilation units on the roof, water source heat pumps and exhaust fans for bathrooms and kitchens. Electrical design includes a generator to support the entire facility, extensions of the existing fire alarm, nurse call, paging, and telephone/data systems. Providing a new closed circuit television system for the building addition and new LED lighting. European style showers to be provided in renovated rooms as well as addition. Extensions of wet sprinkler system to the addition and replacement of existing sprinklers is also included in the scope.
M/E Role
Provided HVAC, Plumbing, Fire Protection and Electrical design services for the renovations and addition to the nursing home.