We are excited to announce that M/E Engineering has joined Salas O’Brien, effective October 2025. Our offices will remain under the same leadership, and our clients can continue to expect the same team and level of service. As M/E and Salas O’Brien work together, we believe clients will benefit from our combined expertise and geographic reach.
Complete MEP upgrades to an aging 573,000 SF facility to allow Harris to consolidate three (3) existing manufacturing facilities under a single roof The updated facility is a “focus factory” manufacturing environment with a 200,000 SF static controlled flexible electronic manufacturing space, support offices, R&D labs, warehouse, distribution and customer product service areas, This approach allows for improved efficiency and faster delivery of Harris systems that are deployed around the world.
The MEP systems range from state-of-the-art temperature and humidity control for the electronic manufacturing space to large open warehouse parts/product storage areas. Upgrades to the 2,800 ton central chilled water plant included variable speed primary/secondary pumping, looped chilled water piping and modifications to allow for 500 tons of “free cooling” during the winter. A looped duct system in the manufacturing area allows for energy savings during low load periods and redundancy in the event of a unit failure.