We are excited to announce that M/E Engineering has joined Salas O’Brien, effective October 2025. Our offices will remain under the same leadership, and our clients can continue to expect the same team and level of service. As M/E and Salas O’Brien work together, we believe clients will benefit from our combined expertise and geographic reach.
Optimax Systems, Inc. was exponentially expanding its coating sales, so its existing clean room space needed to grow to accommodate this. The Class 1,000 and 10,000/ISO 6 and 7 spaces were needed to maintain the consistently high quality of the finished product while increasing the workflow. Additional electric power, cooling, and process gases were needed for the expansion.
The project included humidification, specialized exhaust, desiccant dehumidification, process cooling, and low impedance grounding. The high level of detailed design and coordination with Optimax led to the great success of this project. M/E Engineering provided the clean room HVAC, electric power, process gas, lighting, fire alarm, and fire protection design.