Skip to Main Content

M/E Engineering joins Salas O’Brien

We are excited to announce that M/E Engineering has joined Salas O’Brien, effective October 2025. Our offices will remain under the same leadership, and our clients can continue to expect the same team and level of service. As M/E and Salas O’Brien work together, we believe clients will benefit from our combined expertise and geographic reach.

Learn More

Alfred State College Satellite Boilers
© Gene Avallone

Boiler Burners Replacement

Alfred State College

As part of Alfred State College’s transition away from its central high-temperature hot water plant, this project involved converting existing boiler systems to fully and independently modulating air and natural gas systems. The upgrade was designed to improve energy efficiency and allow burners to operate effectively at low-load conditions.

M/E Engineering designed the replacement of obsolete boiler burners and integrated the new systems into the campus building management system for remote monitoring and control. Completed on an accelerated construction schedule, this project supported the phased installation of satellite boilers and ensured long-term reliability despite the unavailability of original equipment manufacturers.

Client: Alfred State College
Size: 8,211 SF
Awards: N/A
Services:
  • MEP/FP Engineering
Alfred State College Satellite Boilers
© Gene Avallone
Alfred State College Boilers
© Gene Avallone
Share this project: