Skip to Main Content

M/E Engineering joins Salas O’Brien

We are excited to announce that M/E Engineering has joined Salas O’Brien, effective October 2025. Our offices will remain under the same leadership, and our clients can continue to expect the same team and level of service. As M/E and Salas O’Brien work together, we believe clients will benefit from our combined expertise and geographic reach.

Learn More

MEP engineering Kaleida Health

Buffalo General Medical Center Steam Boiler Replacement

Kaleida Health

M/E Engineering led the replacement of the high-pressure steam boiler serving Buffalo General Hospital, Oishei Children’s Hospital, Gates Vascular Institute, and the University at Buffalo. The new “O”-style water-tube boiler doubles capacity to 60,000 lb/hr while improving efficiency, reliability, and emissions.

The project included design of the boiler, feedwater system, stack economizer, controls, exhaust, and blowdown heat recovery. Energy-saving features reduce fuel use and emissions, and dual-fuel capability provides backup with No. 2 oil. M/E coordinated structural, architectural, and civil design, worked closely with contractors, and assisted with NYSDEC air permit updates.

Client: Kaleida Health
Size: 19-stories
Awards: N/A
Services:
  • MEP/FP Engineering
Plumbing Engineering
© Three Sixty° Views
Share this project: